Items of Interest:

List of Local & Federal Officials

When It Rains, It Drains

YCSWA on-going recycling electronics

Snow Removal 2010
Our trucks are all ready for any snow that might come our way.
Please read the newsletter telling you when and where
we do plowing within the township.

  Sidewalks must be cleared within 24 hours after the snowfall has ceased. Please consider opening the intersection and fire hydrants.

Mailbox Policy

  • Operators attempt to plow to the edge of pavement, please keep your box beyond the edge or curb.
    Overhanging boxes damaged will not be repaired.
  • Heavy snow rolling off the plow can sometimes damage boxes. Damage due to pushed snow will not be repaired. A good, strong mailbox or a mailbox designed for heavy snow (cantilever post), usually withstands the storm.
  • Operators do not clear snow for mail delivery, it is too time consuming.